Tili Ota yhteyttä
Ostoskorisi
Toimitus DPD & FedEx
Tarvitsetko apua? Kysy AI:lta

Boker Magnum Long Lead EDC veitsi 01SC080 - 440A drop-point-terä, G-10-kahva, Linerlock

Boker Magnum Long Lead EDC veitsi 01SC080 - 440A drop-point-terä, G-10-kahva, Linerlock
Boker Magnum Long Lead EDC veitsi 01SC080 - 440A drop-point-terä, G-10-kahva, Linerlock
38,73 €
The Boker Magnum Long Lead EDC Knife stands out from typical everyday carry blades with its slim, elongated profile and dual opening options, making it a versatile companion for daily tasks. Built around a reliable 440A stainless steel drop point blade, this knife delivers consistent cutting perform... Lue lisää
Varasto 9 Tuotekoodi 3318994 Merkki BOKER MAGNUM Malli 01SC080 Takuu 2 vuotta

Toimitus ja palautukset

Arvioitu toimitusaika Maanantai, Lokakuu 19
Saat päivitykset yksityiskohtaisen seurantajärjestelmän kautta
Maksuvaihtoehdot
MaksukorttiVisaMastercardPayPalApple PayGoogle PayTilisiirto

The Boker Magnum Long Lead EDC Knife stands out from typical everyday carry blades with its slim, elongated profile and dual opening options, making it a versatile companion for daily tasks. Built around a reliable 440A stainless steel drop point blade, this knife delivers consistent cutting performance while remaining easy to maintain. The black G-10 handle offers a secure, textured grip in all conditions, and the linerlock mechanism ensures safe, solid blade lockup during use. Whether you prefer the quick action of the flipper or the deliberate control of the thumb stud, the Long Lead adapts to your style. With a satin-finished plain edge and a convenient tip-up pocket clip, this knife is ready for everything from opening packages to light outdoor chores.

Highlights

  • 440A stainless steel drop point blade with satin finish and plain edge
  • Dual opening: flipper and thumb stud for fast or controlled deployment
  • Secure linerlock mechanism prevents accidental closure
  • Durable black G-10 handle with textured grip and lanyard hole
  • Tip-up right-hand pocket clip for easy carry
  • Compact yet capable: 88 mm blade, 205 mm overall length

In daily use

The Long Lead EDC Knife excels in everyday scenarios where a reliable, easy-to-access blade is essential. The flipper allows one-handed opening with a quick flick, while the thumb stud offers a more measured approach for precise tasks. The 2.8 mm thick blade provides a good balance between strength and slicing ability, making it suitable for cutting cardboard, rope, or food preparation. The G-10 handle is lightweight yet tough, resisting moisture and wear, and the lanyard hole lets you attach a cord for extra security. The non-reversible clip keeps the knife discreetly in your pocket, ready for action.

Full specifications

  • Brand: Boker Magnum
  • Model: Long Lead EDC Knife
  • MPN: 01SC080
  • EAN: 4045011226663
  • Blade material: 440A stainless steel
  • Handle material: G-10
  • Locking mechanism: Linerlock
  • Opening mechanism: Flipper, thumb stud
  • Blade type: Drop point
  • Blade finish: Satin
  • Edge type: Plain edge
  • Overall length (open): 205 mm
  • Blade length: 88 mm
  • Handle length: 117 mm
  • Blade thickness: 2.8 mm
  • Weight: 125 g
  • Pocket clip: Tip-up, right-hand (non-reversible)
  • Lanyard hole: Yes
  • Handle colour: Black
  • Designer: Boker Magnum
  • Country of origin: China
  • Intended use: Everyday Carry (EDC)

Final note

With its practical design and dependable materials, the Boker Magnum Long Lead EDC Knife is a smart choice for anyone seeking a no-nonsense everyday blade that performs when it counts.

Tekniset tiedot
EAN
4045011226663
Kahvan materiaali
G-10
Kategoria
Knives
Katkoterä
No
Määrä pakkauksessa
1 piece
Malli
Long Lead EDC Knife
Merkki
Boker Magnum
MPN
01SC080
Paino
0.07 kg
Paksuus
2.8 mm
Pituus
205 mm
Sisäänvedettävä terä
No
Terän väri
Satin
Terien määrä
1
Tuotteen väri
Black
Hintahistoria viimeisen 6 kuukauden ajalta
Boker Magnum Long Lead EDC veitsi 01SC080 - 440A drop-point-terä, G-10-kahva, Linerlock
Nykyinen
38,73 €
Alin
38,16 €
Ylin
39,12 €
Muutos 24 h
+0,53 €   +1%
Viikko
+0,04 €   +0%
Kuukausi
-0,40 €   -1%

Suositut tuotteet tässä kategoriassa

Hei, olen DistriNoden tekoälyavustaja. Autan sinua löytämään tuotteita, vertailemaan vaihtoehtoja, laatimaan tarjouksia PDF-muodossa tai tekemään tukipyyntöjä.